Skip to main content

Going up!

21/05/2015

The construction crane for the Joseph & Rosalie Segal Family Health Centre on the VGH campus was installed May 13 to 15. Now that installation is complete, the Willow Street lane has reopened, and on occasion we’ll hear the crane’s horn — but don’t be alarmed. The crane operator is merely using the horn to notify construction site workers of loads being lifted overhead.

Time-lapse video

Watch this time-lapse video of the crane’s installation, click the image below:

 Content Editor


About the new centre

The centre is expected to be completed in 2017 and will feature:
  • Innovative design based on best practice, safety and patient-centred care
  • A welcoming and bright building entry, with lots of natural light in common areas to create cheerful, healing spaces
  • 100 private patient rooms, each with its own bathroom
  • Dedicated, comfortable family and visitor space
  • Access to outdoor space on each unit, rooftop gardens, and a new public park
  • Exercise facilities
  • Quiet places on each floor for reading and meditating

For more information


SOURCE: Going up! ( )
Page printed:

Copyright © Vancouver Coastal Health. All Rights Reserved.